Our thru tubing inflatable retrievable bridge plug is a high-performance inflatable packer that
incorporate a high-expansion inflatable element with a robust chassis for completion remedial
applications. Because the packer is a single-set design, it must be returned to surface and
redressed before re-use. Considering the efficiency and cost factors, a variety of setting and
retrieval methods are designed,Both coiled tubing and slick-line set, and straight pull released.
Applications
Temporary abandonment.
Temporary zonal isolation.
Primary or secondary wellhead barrier.
Temporary frac barrier.
Tubing change outs.
Can be used as a treatment packer or as a completion packer.
Can be run as a completion straddle to isolate perforations,gravel-pack screens,slotted liners or open hole.
In remedial applications it can be used to pump stimulation fluids,cement,or polymers for water control.
Can be used to test tubing,casing, or liner integrity when deployed in conjunction with an existing plug in the wellbore.
Advantges
Excellent anchoring ability, minimizing misruns
Equalization takes place inside and outside the tool string during retrieval,preventing equalization problems and minimizing misruns
High-performance inflation elements,capable of up to 3:1 expansion,make it ideal for high-expansion applications
It can work in environment of 300℉(149℃)
Straight-pull shear release facilitates retrieval on slickline,wireline,and coiled tubing
Small ID and high expansion ratio allows the tool can be set below the production tubing
Does not require a rig on location, reducing operation costs
--- Our Contact
Get In Touch With Us ?
Company address
Contact: Mr. Han
Hancl@hisen-energy.com
08386083121/15283832586
No.26-1,Deyang Nanshan science and Technology IsLand,Guanghan City,Deyang City,Sichuan,China